home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V15_0 / V15NO045.TXT < prev    next >
Internet Message Format  |  1993-07-13  |  30KB

  1. Date: Wed, 29 Jul 92 05:00:04    
  2. From: Space Digest maintainer <digests@isu.isunet.edu>
  3. Reply-To: Space-request@isu.isunet.edu
  4. Subject: Space Digest V15 #045
  5. To: Space Digest Readers
  6. Precedence: bulk
  7.  
  8.  
  9. Space Digest                Wed, 29 Jul 92       Volume 15 : Issue 045
  10.  
  11. Today's Topics:
  12.                 Antimatter (was propulsion questions)
  13.                          Calendar and Zodiac
  14.                         Clinton Space Position
  15.                               Decisions
  16.                                 Delta
  17.                      Early Robotic Lunar Missions
  18.                         ETs and Radio (2 msgs)
  19.       Inverse Ephemeris (time as a function of position) Wanted
  20.       Russian/French Soyuz TM-15 mission launched to Mir station
  21.  
  22.     Welcome to the Space Digest!!  Please send your messages to
  23.     "space@isu.isunet.edu", and (un)subscription requests of the form
  24.     "Subscribe Space <your name>" to one of these addresses: listserv@uga
  25.     (BITNET), rice::boyle (SPAN/NSInet), utadnx::utspan::rice::boyle
  26.     (THENET), or space-REQUEST@isu.isunet.edu (Internet).
  27. ----------------------------------------------------------------------
  28.  
  29. Date: Tue, 28 Jul 92 13:38:12 EST
  30. From: PHARABOD@FRCPN11.IN2P3.FR
  31. Subject: Antimatter (was propulsion questions)
  32.  
  33. It seems that antiprotons can live inside matter far longer than was
  34. initially thought. In 1947, Fermi and Teller calculated a 10^-13 seconde
  35. value ( 0.1 picosecond). But from bubble chambers experiments with
  36. negative pions and kaons, it was inferred that the real time could be
  37. 100 picoseconds. Now, first at the KEK Japanese laboratory, and then
  38. at CERN, it has been shown that, inside helium at 6 atm. pressure,
  39. 4% of the antiprotons live several microseconds. If the helium is
  40. "contaminated" with a small amount of hydrogen (0.04 %) this time is
  41. divided by about 10. Many questions remain, in particular is this a
  42. specific property of helium.
  43.  
  44. J. Pharabod
  45.  
  46. Reference:"Antiprotons refractaires a l'annihilation", Courrier CERN,
  47. June 1992.
  48.  
  49. ------------------------------
  50.  
  51. Date: 28 Jul 92 12:06:03 GMT
  52. From: John Roberts <roberts@CMR.NCSL.NIST.GOV>
  53. Subject: Calendar and Zodiac
  54. Newsgroups: sci.space
  55.  
  56. -From: stgprao@xing.unocal.com (Richard Ottolini)
  57. -Subject: Re: Calendar and Zodiak
  58. -Date: 27 Jul 92 22:07:16 GMT
  59. -Organization: Unocal Corporation
  60.  
  61. -No, the calendar stays the same, but the sky changes.
  62. -The yearly calendar until @1950 was defined as the time between extremal
  63. -positions of the sun: furthest north or south of the year etc.
  64. -However, the position of sun with respect to the stars at the extremal point
  65. -moves slightly each year- about the diameter of the moon per 36 years.
  66. -The vernal equinox (spring) now occurs when the Sun is in the constellation
  67. -Aquarius.  During the Roman Empire the sun was one constallation over in Pisces
  68. -during the equinox.
  69. -After 1950 the length of the year is defined in terms of vibrations of cesium
  70. -atoms which are ten million times more stable than the length of a year.
  71.  
  72. Thanks for the explanation. I would like to add a refinement: It's the
  73. *second* which is defined by atomic vibrations - larger units of time are
  74. roughly defined by number of seconds, but the passage of the larger units of 
  75. time is still subject to celestial motions. You can't say "there are x seconds
  76. in a year, so the instant corresponding to this one 100 years ago was
  77. exactly 100x seconds ago". The Naval Observatory keeps track of the passage
  78. of the sun (and possibly the stars - I'm not sure), so there's no ongoing shift
  79. between local solar noon and noon by the clock. Since the Earth's rate of
  80. rotation is not constant, the clock time has to be adjusted every now and then.
  81. The year is *probably* defined by the background of distant stars, at least
  82. in the long run.
  83.  
  84. John Roberts
  85. roberts@cmr.ncsl.nist.gov
  86.  
  87. ------------------------------
  88.  
  89. Date: 28 Jul 92 14:36:54 GMT
  90. From: Doug Davey <ddavey@iscp.bellcore.com>
  91. Subject: Clinton Space Position
  92. Newsgroups: sci.space
  93.  
  94. In article <BrwJvH.5qx@zoo.toronto.edu>, henry@zoo.toronto.edu (Henry Spencer) writes:
  95. > In article <1992Jul22.210517.4603@access.digex.com> rbunge@access.digex.com (Robert Bunge) writes:
  96. > >administrations have failed to establish priorities, and because
  97. > >they have not matched program needs with available resources, NASA
  98. > >has been saddled with more missions than it can successfully
  99. > >accomplish.
  100. > Translation:  we're going to kill some of the NASA programs, although
  101. > of course we're not going to tell you which ones.
  102.  
  103. [ Several more "translations" deleted. ]
  104.  
  105. > -- 
  106. > There is nothing wrong with making      | Henry Spencer @ U of Toronto Zoology
  107. > mistakes, but... make *new* ones. -D.Sim|  henry@zoo.toronto.edu  utzoo!henry
  108.  
  109. Henry, your technical postings are probably the best things in sci.space.*.
  110. However, I would respectfully ask that those who neither pay the taxes
  111. nor vote in the elections kindly refrain from posting politcal analyses
  112. of political statements from the USAian election campaign.  If you have a
  113. technical reason why something a candidate proposes is a good or bad idea,
  114. fine.  However, a cross border political analysis is rude at best.  Thanks.
  115. Stop Canadian Imperialism!  Yankee Go Home! :-)
  116.  
  117. -- 
  118. +--------------------------------------------------------------------+
  119.   Doug Davey        ddavey@iscp.bellcore.com         bcr!iscp!ddavey
  120.  
  121. ------------------------------
  122.  
  123. Date: 28 Jul 92 12:19:04 GMT
  124. From: John Roberts <roberts@CMR.NCSL.NIST.GOV>
  125. Subject: Decisions
  126. Newsgroups: sci.space
  127.  
  128. -From: flower@hpcc01.corp.hp.com (Graham Flower)
  129. -Subject: Stellar Structure References
  130. -Date: 27 Jul 92 23:55:18 GMT
  131. -Organization: the HP Corporate notes server
  132.  
  133. -...
  134.  
  135. -Graham Flower ms 90-TT               |  Better to have convictions and act on 
  136. -Hewlett-Packard  350 W Trimble Rd    |  them, even if they are wrong, than to  
  137. -Microwave Semiconductor Division     |  waffle in indecision.
  138.  
  139. I don't agree with that as a general rule for living. You have to weigh the
  140. expected cost of making the wrong decision against the opportunity cost of
  141. postponing the decision. Often the reason for indecision is lack of adequate
  142. information to make a good decision, and often this problem can be remedied
  143. if you wait until better information is available. Sometimes an entirely new
  144. option becomes available, that is better than any of the previous choices.
  145. It really has to be judged on a case-by-case basis.
  146.  
  147. John Roberts
  148. roberts@cmr.ncsl.nist.gov
  149.  
  150. ------------------------------
  151.  
  152. Date: Tue, 28 Jul 1992 00:25:00 GMT
  153. From: seds%cspar.decnet@Fedex.Msfc.Nasa.Gov
  154. Subject: Delta
  155. Newsgroups: sci.space
  156.  
  157. In article <150geiINNgif@agate.berkeley.edu>, gwh@soda.berkeley.edu (George William Herbert) writes...
  158. >In article <9207261355.AA18061@cmr.ncsl.nist.gov> roberts@CMR.NCSL.NIST.GOV (John Roberts) writes:
  159. >>[...]
  160. >>There have been proposals for a heavylift Delta, which as I gather is 
  161. >>essentially a whole batch of Delta rockets (complete with boosters)
  162. >>strapped together. 
  163. >>[...]
  164. >    The HL Delta design doesn't use solid boosters on all the
  165. >"core" vehicles... the one I saw had 24 Castors, four per on the
  166. >six outer Delta vehicles.  The problem that you pointed out [deleted from
  167. >included text] with staging solid boosters from the "inside" of the
  168. >cluster is avoided by not putting any inside 8-)
  169. >    The HL Delta is a neat vehicle concept... it does as reported
  170. >here have a safety margin in excess of 2.0 in all of the new hardware,
  171. >because the designer didn't want to spend $5 billion dollars and five
  172. >years to qualify it.  He was figuring an order of magnitude
  173. >less expensive and eighteen months.  Probably optimistically,
  174. >but nonethelessvery reasonable. 8-)  I had a chance to talk to 
  175. >him for a while ... he knew it could be done quick and dirty and wanted
  176. >to do it that way, dammit. 8-)  [name escapes me entirely, and I may
  177. >not have written it down... sorry].
  178. >-george william herbert
  179. >gwh@soda.berkeley.edu
  180.  
  181. You know what's funny here is that this idea was tried successfully about 
  182. thirty years ago. The boosters that were paralled together were Redstones, and
  183. the vehicle produced was the Saturn I and IB. Very successful rockets, 28
  184. launches and *NO* failures. 
  185.  
  186. Dennis, University of Alabama in Huntsville
  187.  
  188. ------------------------------
  189.  
  190. Date: 28 Jul 92 14:03:06 GMT
  191. From: Bill Higgins-- Beam Jockey <higgins@fnalf.fnal.gov>
  192. Subject: Early Robotic Lunar Missions
  193. Newsgroups: sci.space
  194.  
  195. [Remember I was complaining about the dearth of information on the
  196. NASA Office of Exploration lunar missions?  Here's my contribution to
  197. filling the gap. Reprinted with permission from *Lunar and Planetary
  198. Information Bulletin* No. 63, May, 1992. --WSH]
  199.  
  200.          BACK TO THE MOON -- EARLY ROBOTIC MISSIONS                            
  201.  
  202. by David C. Black and Paul D. Spudis                                            
  203.  
  204. NASA's newly re-established Office of Exploration is planning several   
  205. small, robotic missions to the Moon within the next three years to
  206. begin the Space Exploration Initiative, the nation's program
  207. to return to the  Moon and journey to Mars. The need for
  208. small, unmanned lunar missions is both technical and
  209. programmatic. To support extended human operations on and
  210. around the Moon we must acquire knowledge about the distribution of 
  211. lunar resources and the detailed characteristics of the surface at
  212. proposed  human outpost sites, and we must learn more about the
  213. gravity field and  global terrain. For the program to succeed,
  214. we must demonstrate that innovative, inexpensive
  215. exploration techniques are feasible and will   produce
  216. quality results.                                                      
  217.  
  218.   A Workshop on Early Robotic Missions to the Moon was held at the
  219. Lunar and Planetary Institute, February 4-6, 1992, to assess instruments 
  220. that could be used on these early unmanned missions. Instruments 
  221. were evaluated mainly for scientific relevance and quality of the 
  222. dataset that they would return; however, their usefulness in resource 
  223. exploration and processing was also considered.          
  224.  
  225.   The Office of Exploration has established four themes for early lunar         
  226. robotic missions: resources, terrain--both topography (altimetry) and           
  227. surface morphology (imaging)--gravity, and lander missions.                     
  228.  
  229. ORBITAL AND LANDED PAYLOADS                                                     
  230.  
  231. Sixty instrument or mission concept proposals, about equally divided            
  232. between orbital and landed operation, were considered.                          
  233.  
  234.   The Lunar Exploration Science Working Group (LEXSWG), a standing advisory     
  235. group to the Solar System Exploration Division of NASA's Office of Science      
  236. and Applications (OSSA), has developed a prioritized list of global data        
  237. sets with specific quantitative measurement requirements that are desired       
  238. from lunar orbital missions (see table). The workshop found that there are      
  239. excellent candidate instruments to obtain these datasets. At present, there     
  240. is no prioritized list of data sets expected from payloads landed on the        
  241. lunar surface (although one is being developed by the LEXSWG).                  
  242.  
  243.    We discussed landed payloads in the context of the proposed "common          
  244. lunar lander," Artemis. Payload capability would be only about 65 kg for        
  245. the first lander, but most proposals anticipate a 200-kg capability, which      
  246. is being investigated for subsequent versions of Artemis. Also, the             
  247. baseline design of Artemis has no provisions for power or communications.       
  248. These engineering constraints did not affect the workshop's assessment of       
  249. the various landed instruments.                                                 
  250.  
  251.    While landed payloads in general are not as fully developed as orbital       
  252. payloads, a wide and interesting range of concepts offers great scientific      
  253. potential as well as being useful for exploring lunar resources.                
  254.  
  255. RECOMMENDATIONS                                                                 
  256.  
  257. We concluded that these missions offer the opportunity to do outstanding        
  258. science, and that there are high-quality instruments that could be flown        
  259. within three years, including landed science as well as orbital science         
  260. instruments.                                                                    
  261.  
  262.   Flight-ready, new-generation instruments are, in general, not immediately     
  263. available, and some of the more promising instruments that were reviewed,       
  264. while not new in concept, are still at the advanced testing and breadboard      
  265. stages. This is because relatively little lunar instrument development has      
  266. been done during the past decade and a half, so most of the state-of-the-       
  267. art instruments reviewed at the workshop were developed for nonlunar            
  268. missions, or their components have been qualified for spaceflight in other      
  269. contexts. The suite of instruments that we recommend can be flown within        
  270. three years, as long as prompt and adequate funding is made available to        
  271. the instrument teams. The Office of Exploration should take the lead in         
  272. establishing a flight instrument development program.                           
  273.  
  274.   This instrument situation applies not only to the science payloads, but       
  275. to the resource-utilization payloads that were reviewed at the workshop.        
  276. The maturity of the proposed resource utilization concepts, potentially         
  277. quite useful to achieving the goal of a permanent human presence, is not as     
  278. advanced as those for many of the science instruments; few have even            
  279. breadboard hardware models. As with science instruments, there is a             
  280. critical need for NASA to initiate resource instrument development.             
  281. Resource utilization instruments could be flown soon after more mature          
  282. science instruments, provided that development starts soon.                     
  283.  
  284.   The workshop also noted a pressing requirement for mobility on early          
  285. landed science missions and that the JPL minirover is relatively mature and     
  286. addresses most mobility needs for early exploration. The Office of              
  287. Exploration should examine whether other engineering solutions could be         
  288. developed quickly enough.                                                       
  289.  
  290. Orbital Mission 1  Resources                                                    
  291.  
  292. Three proposed instruments working together can provide global maps of          
  293. lunar chemistry and mineralogy. We believe that given adequate and timely       
  294. resources, flight-ready versions of these instruments can meet a launch         
  295. date within three years. Their combined mass, power, and datarates are          
  296. plausible for orbiters of modest capacity.                                      
  297.  
  298.   A gamma ray/neutron spectrometer with a germanium detector would provide      
  299. global chemistry with a low resolution footprint (dependent on orbital          
  300. altitude, but greater than 100 km). This is the only instrument that senses     
  301. composition to depths greater than several micrometers. The scientific          
  302. return is very high, but cooling the detector to 70 K poses a challenge.        
  303. Should this preclude a 1995 launch, a similar instrument using a sodium         
  304. iodide detector could provide useful preliminary information until the Ge       
  305. detector is launched later.                                                     
  306.  
  307.   A soft X-ray fluorescence instrument, to be flown soon on the Alexis          
  308. spacecraft, can detect all major elements with high spatial resolution (1-      
  309. km pixels) to yield far more definitive constraints about regolith              
  310. characteristics, origin, and evolution than was thought possible from an        
  311. orbital mission until very recently.                                            
  312.  
  313.   A visible-infrared reflectance instrument provides information on             
  314. minerals in surface soils. A full-scale imaging spectrometer collects image     
  315. data in hundreds of spectral channels; thus, each pixel has a single            
  316. spectrum of up to 256 points. If this instrument is not ready for flight in     
  317. three years, a capable multispectral imager (of about six channels) could       
  318. be sent on an early lunar mission. One of these instruments should be part      
  319. of the first suite of instruments; the choice between them is a matter of       
  320. technical readiness. The full-scale imaging spectrometer should be flown as     
  321. early as possible.                                                              
  322.  
  323. Orbital Mission 2  Terrain                                                      
  324.  
  325. From the Apollo program, we already have some maps of the topography and        
  326. gravity field of the Moon. However, serious gaps exist in these data in         
  327. both in coverage and quality. Instruments for a second orbiter should           
  328. obtain global gravity and terrain information to support exploration and        
  329. scientific studies.                                                             
  330.  
  331.   A laser altimeter can collect global altimetry giving us an accurate          
  332. picture of the lunar figure and gross topography of large regions. A number     
  333. of the proposed altimeters have some flight hardware derived from the Mars      
  334. Observer program. Which one to select is purely an engineering issue, as        
  335. long as the instrument meets the LEXSWG requirements (Table 1).                 
  336.  
  337.   Mapping variations in the gravity field on both the nearside and farside      
  338. is important for operations in lunar orbit and to understand the internal       
  339. composition and state of the Moon. Because global coverage is considered        
  340. essential, two spacecraft are necessary to determine the gravity field (the     
  341. nearside can be done with one); the second spacecraft is an extremely           
  342. inexpensive "subsatellite" deployed directly from the main orbiter. The         
  343. most rapid characterization of the global field would be achieved by a          
  344. concept in which a passive laser reflector co-orbits with the main orbiter      
  345. at a relatively low altitude. Instrument readiness will determine which         
  346. technique is selected.                                                          
  347.  
  348.   Coupling imaging with altimetry and gravity will achieve excellent            
  349. science return as well as operational information that would be of longterm     
  350. use to the Exploration Initiative. The imaging system should be capable of      
  351. taking stereo imaging data at a ground resolution of 15 m/pixel; a              
  352. highresolution mode (2 m/pixel) would permit detailed study of specific         
  353. sites for landed missions, either human or robotic. This global                 
  354. cartographic database will serve exploration needs in both science and          
  355. operations. Several imaging systems were considered: All would provide          
  356. quality data and all have some flight hardware available.                       
  357.  
  358. Lander Mission  Surface Rover(s)                                                
  359.  
  360. Although landed payload instruments are not as highly developed, a capable      
  361. suite of instruments can be available to fly on the prototype Artemis           
  362. lander.                                                                         
  363.  
  364.   After considering several possibilities, the workshop concluded that a        
  365. surface rover mission is a logical candidate for the first Artemis mission.     
  366. JPL has been designing and fabricating test rovers for several years,           
  367. including a set of minirovers, two of which could fit within the 65-kg          
  368. payload of the first Artemis mission.                                           
  369.  
  370.   Several instruments could be mounted on such a rover to characterize in       
  371. some detail the compositional and physical properties of a potential lunar      
  372. outpost site. This mission could be either the prelude to more extensive        
  373. surface investigation (by robotic or human missions) or a onetime               
  374. exploration of a scientifically interesting or operationally challenging        
  375. site.                                                                           
  376.  
  377.   An alpha-proton backscatter spectrometer would provide important              
  378. information on the chemical composition of lunar soils. A Mossbauer             
  379. backscatter spectrometer would complement the alphaproton instrument and        
  380. provide highquality mineralogical data in addition to measurements of soil      
  381. maturity. Stereo, highresolution cameras would document compositional           
  382. analyses, permit physical characterization of the site, and allow all of us     
  383. on Earth to share the excitement of the first return to the Moon.               
  384.  
  385.   These instruments are a minimum to return excellent scientific and            
  386. resource characterization data. Other instruments, in particular an evolved     
  387. gas analyzer to measure in situ concentrations of solar wind hydrogen,          
  388. should be added to the rover payload as resources permit.                       
  389.  
  390. CONCLUSIONS                                                                     
  391.  
  392. Not only were logical collections of instruments identified to carry out        
  393. specific exploration themes, but we found that it's highly probable that        
  394. these instruments can be built, integrated onto a spacecraft bus, tested,       
  395. and launched within the 3-year schedule proposed by the Office of               
  396. Exploration. This is indeed a "faster, cheaper, better" way of  exploring       
  397. space. Scientists who attended strongly endorse this new approach and stand     
  398. ready to help the Office of Exploration carry out the Space Exploration         
  399. Initiative.                                                                     
  400.  
  401. (Dr. Black is Director of LPI; Paul Spudis is a Staff Scientist                 
  402. at LPI.)                                                                        
  403.  
  404. LEXSWG Orbital Dataset Requirements for Global Measurements                     
  405.  
  406. Priority     Measurement               Requirement                              
  407.    1         Elemental Composition.....<100-km resolution                       
  408.                                        <20% precision                           
  409.    2         Topography................<1-km resolution                         
  410.                                        <+10-m vertical                          
  411.              Gravity...................<100-km resolution                       
  412.                                        +1 mgal                                  
  413.    3         Mineral Composition.......<500-m/pixel resolution                  
  414.                                        +5% abundance                            
  415.    4         Imaging...................15+5-m/pixel resolution                  
  416.                                        100-300-m pos. accuracy                  
  417.    5         Magnetic..................<30-km resolution                        
  418.                                        +0.1-nT precision                        
  419.    6         Atmosphere................Species present, state                   
  420.                                        <100-km resolution                       
  421.                                        +10% precision                           
  422.    7         Surface thermal...........<100-km resolution                       
  423.                                        0.5 degrees K (+4 mW/m^2)                
  424.  
  425. ------------------------------
  426.  
  427. Date: 28 Jul 92 10:57:43 GMT
  428. From: James Annis <annis@hale.ifa.hawaii.edu>
  429. Subject: ETs and Radio
  430. Newsgroups: sci.space
  431.  
  432. In article <a7327850@Kralizec.fido.zeta.org.au> derek.wee@f820.n680.z3.fido.zeta.org.au (Derek Wee) writes:
  433. >
  434. >Anyone have any good arguments FOR the existence of extraterrestrial 
  435. >intelligence?
  436. >
  437.            11                 9
  438. sure:    with 10   stars in our galaxy, 10  galaxies in the observable 
  439.     universe, the odds of us being unique start at
  440.       20
  441.     10  to 1 against. 
  442.  
  443. --
  444.  
  445. James Annis               annis@galileo.ifa.hawaii.edu     
  446.  
  447. ------------------------------
  448.  
  449. Date: 28 Jul 92 13:02:36 GMT
  450. From: russell wallace <rwallace@unix1.tcd.ie>
  451. Subject: ETs and Radio
  452. Newsgroups: sci.space
  453.  
  454. Given that for evolution of life to start, a simple living organism must
  455. come together from amino acids etc. by accident; and that for any
  456. complex structure to fall together by accident is extremely improbable;
  457. then it looks pretty much like the odds against life appearing on any
  458. one planet could easily be more than 10^1000 to 1 against, and the
  459. number of planets in the visible universe is only about 10^22.
  460.  
  461. --
  462. "To summarize the summary of the summary: people are a problem"
  463. Russell Wallace, Trinity College, Dublin
  464. rwallace@unix1.tcd.ie
  465.  
  466. ------------------------------
  467.  
  468. Date: 28 Jul 92 12:01:34 GMT
  469. From: Gary Murphy <murphyg@Software.Mitel.COM>
  470. Subject: Inverse Ephemeris (time as a function of position) Wanted
  471. Newsgroups: sci.space,sci.astro
  472.  
  473. In article <1992Jul27.190630.15531@cco.caltech.edu> rmm@ariane.ipac.caltech.edu (Mike Melnyk) writes:
  474.  
  475.    I am in need of an inverse ephemeris for the sun. That is, I am
  476.    looking for function that returns the time of year, given the position
  477.    of the sun in geocentric ecliptic coordinates and a year of interest
  478.    (e.g., 1994).
  479.  
  480.    This function only need be accurate to 1' from 1994 - 2000. 
  481.  
  482.    Yes, yes, I know that I can use a true solar ephemeris (e.g.,
  483.    Van Flandern and Pulkkinen's formulae) to iteratively solve for
  484.    the time of year, but I'd rather not take the time to write and test
  485.    the code if an inverse ephemeris exists. 
  486.    -------------------------------------------------------------------------
  487.    Mike Melnyk                                         rmm@ipac.caltech.edu
  488.    Infrared Processing and Analysis Center             
  489.    JPL/Caltech
  490.  
  491. Does this imply JPL is investigating Nostradamus? :-)
  492.  
  493. seriously (before wolf flames me for not being so ;-) ...
  494.  
  495. Elwood Downey's most excellent (and free) ephem program will do not only
  496. this, but also return all those composite conjunctions and separations
  497. which Michel d'Notradame was so fond of (if only he'd had a PC in 1557!)
  498.  
  499. I don't know where exactly to find them, but an archie server should be
  500. asked to look for ephem (I think the current version is 4.13) or xephem
  501. if you can compile for X11/Motif (I can't :-( )
  502.  
  503. I've posted this in addition to mailing it, just in case NASA and NRAO
  504. are also looking into Nostradamus' Aug 12, 1999 predictions :-)
  505.  
  506. --
  507. Gary Lawrence Murphy - Gary.Murphy@software.mitel.COM - (613) 592-2122 x3709
  508.           In this very moment - what is there lacking? -- Hakuin
  509.  
  510. ------------------------------
  511.  
  512. Date: Tue, 28 Jul 1992 00:10:28 GMT
  513. From: Glenn Chapman <glennc@cs.sfu.ca>
  514. Subject: Russian/French Soyuz TM-15 mission launched to Mir station
  515. Newsgroups: sci.space
  516.  
  517.      The Russian/French Soyuz TM-15 mission to the Mir space station was 
  518. launched today (July 27). Onboard this  flight were cosmonauts Anatoli 
  519. Solovyov and (Soyuz TM-5 to Mir June '88 for 9 days and Soyuz TM-9 to Mir in 
  520. Feb '90 for 180 days) Sergei Avdeyev (first mission) from CIS (Commonwealth 
  521. of Independent States) plus Frenchman Michel Tognini (also first flight).  
  522. The crew will dock with the Mir complex on July 29th to join cosmonauts 
  523. Alexander Viktorenko and Alexander Kaleri, who are in their 5th month in 
  524. space (since Mar. 17th).  This "Antares" mission was paid for by the French 
  525. and is devoted to life sciences/materials processing.  Equipment for the 
  526. flight was brought up on the Progress M-13 cargo craft which was launched on 
  527. June 30th and docked with Mir on July 4th, after an unsuccessful docking 
  528. attempt on July 2nd.  One interesting point is the duration, which was 
  529. originally set for 12 days, then increased to 16 days several months ago.  
  530. After this mornings launch the CBC reported it as a month long mission. 
  531. Viktorenko and Kaleri will return with Tognini in the Soyuz TM-14 craft.
  532.  
  533.     Solovyov and Avdeyev are scheduled to receive Progress M-14 on Aug. 14th 
  534. bringing up the 0.7 Tonne Sofora propulsion unit (VDU).  Solovyov and Avdeyev 
  535. will engage in four space walks to attached the Sofora to the 14 metre truss 
  536. built on the Kvant module by Arsebarski and Krikalev in July 1991.  The long 
  537. leaver arm of the truss will enable the Sofora rockets to control the 
  538. attitude of the Mir complex with considerably less fuel usage.  The heavy 
  539. attitude demands of Mir, with tis two 20 Tonne side modules, have put 
  540. excessive demands on the gyrodyne attitude controllers on the Kvant modules, 
  541. causing 5 of them to suffer damage. October will see Progress M-15 bring up a 
  542. test solar sail that will be deployed about Oct. 20th.
  543.  
  544.     The next mission is scheduled for November when cosmonauts Manakov and 
  545. Poleshchuk bring up an Israeli visitor on a commercial mission. Manakov and 
  546. Poleshchuk are training for the space walks to repair the gyrodynes, which 
  547. were never expected to be replaced in space. (Radio Moscow, CBC radio and 
  548. Spaceflight, July)
  549.  
  550.     Sorry that I have been off the net in reporting for a while.  
  551.  
  552.                             Glenn Chapman
  553.                                                         School Eng. Science
  554.                             Simon Fraser U.
  555.                                                         Burnaby, B.C., Canada
  556.                             glennc@cs.sfu.ca
  557.  
  558. ------------------------------
  559.  
  560. End of Space Digest Volume 15 : Issue 045
  561. ------------------------------
  562.